The process of moving an electrical panel involves meticulous steps to ensure safety and compliance:
- Planning: Assessing the new location, evaluating wiring requirements, and confirming adherence to safety codes is crucial. (source)
- Disconnecting: Safely shutting down the power and disconnecting the panel is an initial step to ensure safety.
- Rerouting: Reconfiguring wiring and conduits is necessary to reach the new location safely.
- Installation: Mounting the panel, reconnecting circuits, and ensuring proper grounding is vital for functionality.
- Testing and Inspection: Comprehensive testing and acquiring necessary inspections ensure functionality and compliance with regulations.