ADU Electrical Services in San Jose, CA

One point of contact for your ADU’s electrical scope, from permit to final inspection.
Request Service

Full name, phone, and email are required — tell us as much or as little as you like.

We typically respond within about 10 minutes.

Building an ADU in San Jose involves coordinating between you, your ADU contractor, and the city’s permit process, and the electrical scope sits right in the middle of all three. This page covers what that coordination actually looks like.

ADU Electrical Scope in San Jose

Sub-Panel Installations

The most common setup for a detached ADU sharing the main service.

Separate Meter Setups

For larger ADUs or where full electrical independence is preferred.

Dedicated Circuit Wiring

Mini-split heat pumps, water heaters, and AFCI-protected living zones.

City of San Jose Permit Process

City of San Jose/Santa Clara County permit turnaround for ADU electrical work runs about 1-3 weeks as a safe estimate for standard projects requiring review. San Jose’s express plan-check process can move qualifying simple work faster; complex projects can take longer. We file the permit and coordinate inspection as part of the job.

Sub-Panel vs. Separate Meter

Most San Jose ADUs are wired with a sub-panel fed from the main service, sized under Title 24, rather than a separate utility meter. We’ll walk you through which setup makes sense for your specific ADU size and planned electrical load.

A Recent San Jose ADU Project

A San Jose 550 sq. ft. detached-garage ADU conversion needed full electrical separation without adding a separate utility meter. We sized the system under Title 24, trenched a 90A feeder to a new 125A subpanel, and wired dedicated circuits for a mini-split heat pump, water heater, and AFCI-protected living zones.

What Our Customers Say

“Handled all the ADU electrical wiring and subpanel hookup in San Jose. Permitting was seamless and the work quality was top tier.”
Valerie P.
“Handled all the ADU electrical wiring and subpanel hookup in San Jose. Permitting was seamless and the work quality was top tier.”
Valerie P.

What It Costs

ADU Electrical
From $2,000

Frequently Asked Questions

How does the City of San Jose ADU permit process work?

Use 1-3 weeks as a safe estimate for standard projects requiring review; San Jose’s express plan-check process can move qualifying simple work faster.

Yes, we work directly with your builder so the electrical scope stays on the same timeline as the rest of the build.

Most San Jose ADUs use a sub-panel fed from the main service; we’ll confirm which setup fits your ADU’s size and planned load.

Get a Free ADU Electrical Scope Consult

Planning an ADU in San Jose? Let’s talk through the electrical scope before your permit application goes in.

Thank you for Subscribing

We’re delighted to have you! After confirming your subscription, a discount code will be sent directly to your email. Be sure to check your SPAM folder, as the email may have been directed there.

Exclusive Web Offer

SAVE 10% TODAY

10% OFF ALL ELECTRICAL SERVICES

From everyday electrical repairs to larger projects, take 10% off your service.

Use Coupon Code

SAVE10

Mention the code when you call to redeem your discount.

Ready to Save? Call Now Call
(800) 568-8664
10% OFF

10% OFF

Subscribe now and enjoy 10% Discount for your first order and with access to our newsletters

15% OFF
Enjoy a 15% discount on our
Christmas landscape lighting offer!