How Long does it Take for Ladbs to Approve an Electrical Permit?

The time required for the Los Angeles Department of Building and Safety (LADBS) to approve an electrical permit depends on the complexity of your project and the submission method:

  • Over-the-counter submissions: Simple permits, such as those for New Electrical Circuits Installation or basic Outlets and Switches work, are often issued the same day through the online portal.
  • Standard residential projects: For typical work like a 200 Amp Panel Upgrade, processing generally takes 1 to 2 weeks.
  • Specific installations: EV/Tesla Charger Installation permits usually take between 5 and 10 business days, while minor tasks like Recessed Lighting Installation typically process in 3 to 5 business days.
  • Complex projects: If your project requires a full plan-check review or involves complex corrections, the timeline may be extended beyond these typical ranges.